Overview
- Rivian says the R2 is in final validation testing after January validation builds in Normal, Illinois, with durability runs from -45°F to 122°F.
- Early media drives of near‑final prototypes report about 656 hp, 609 lb‑ft, 0–60 mph in 3.6 seconds, an estimated 300+ miles from an 87.4 kWh pack, and 10–80% charging in roughly 30 minutes.
- The company set March 12 for a full reveal of pricing, colors, options, and confirmed launch specifications.
- Rivian plans to launch with a higher‑margin Performance Dual Motor configuration, and availability of the roughly $45,000 base trim this year remains unconfirmed.
- A showroom representative indicated mid‑April deliveries, which Rivian has not formally confirmed beyond first‑half timing, as Barclays forecasts about 48,000 total deliveries in 2026.