Overview
- Fresh scaffolding now blankets the former Muppet*Vision 3D theater, including the clock tower, after weeks of brick removal and new facade cutouts for planned theming.
- Scaffolding also wraps the front and side of Gonzo’s Royal Flush with a tower by the PizzeRizzo patio, as both locations remain in place for retheming rather than demolition.
- A large crane is stationed at the Monsters, Inc. door coaster site, where aerial photos show layered concrete, rebar grids, conduits, and footers advancing toward vertical construction.
- Concept art points to the theater being retitled The Glob with a show inside, alongside a rethemed PizzeRizzo, a Harryhausen’s sushi restaurant, and the headlining door coaster, though details could evolve.
- Disney has not announced an opening date, and reporting indicates the multi-building overhaul will take years as crews repurpose existing infrastructure.